Plaine 11 – HVAC renovation with CPE

Building

  • Assignment: Offices
  • Area: 9,177 m²

Actors

  • Client: Fidentia
  • Property Manager: BNP Paribas Real Estate
  • Design office: Deplasse & Associates
  • Technical operator: TEM

Assignment

  • Technical Due Diligence
  • HVAC renovation with installation of a 4-tube heat pump and installation of photovoltaic panels
  • Implementation of an Energy Performance Contract
  • IPMVP Compliant Monthly Energy Tracking
  • Quarterly maintenance check
  • PEB Tertiary Certificate (Class B)
  • BREEAM in Use (Very Good)

 

-60% in fuel

-10% in electricity

> 25,000 € excl. VAT/year

The building's refrigeration machine at the end of its life and the discomfort problems encountered in the past prompted the client and the design office to think about a global approach in the HVAC renovation of this Brussels office building. Given the simultaneous needs for hot and cold, a 4-tube heat pump was installed to cover all the cold needs, and part of the heat needs. In order to ensure that this over-investment is profitable, a 10-year tripartite Energy Performance Contract (EPC) has been drawn up between the customer, the operator and the design office.

en_USEnglish